Projects

Col Groves Electrics (SE Qld office) have undertaken the following works in anticipation of the 2018 Commonwealth Games,

  • Installation of the Track & Field Conduit and Pit system which allows for all the required Electrical/Technology/Ceremony/Broadcast cabling to be concealed.
  • Installation of Transponder Loops, these loops are what provides the Athletes Finish times as well as checkpoint times.
  • Disconnection & Removal of the 4 storey Stadium Scoreboard.
  • Reinstallation of scoreboard Post Games.

Leave a Comment

Share this Article

[contact-form-7 404 "Not Found"]